where there is a likelihood of mobile plant operating nearby, the scaffolding should be protected from impact by the use of barricades, buffer rails, concrete or timber kerbs.components must be kept clear of overhead powerlines (minimum clearance of 4 metres for metal and 1.5 metres for timber).defective or incomplete scaffolding must not be accessed and should be sign posted with 'Scaffold incomplete - Do not use'.access stairs or ladders must be positioned internally with a slope of 1 in 4 and securely fastened near the top and bottom.guardrails, mid-rails and toe boards must be fitted on the working deck (mesh screens may also be used to provide additional protection from falling materials).it must be properly braced and fully planked.it must be stably erected on level foundations with proper soleplates and baseplates.the manufacturers/suppliers written instructions for correct erection, use and dismantling must be followed.adequate instruction, training and supervision must be provided before and during the erecting, use and dismantling of scaffolding.To prevent common problems occurring with scaffolding: Instructions on the safe assembly of a mobile scaffold are available from the supplier and instructions are also displayed on most mobile scaffolds in the form of a sticker. Mobile scaffolds are easy to erect, use and dismantle, but are safe only if erected by a competent person. Mobile scaffolds are often hired and used by finishing trades people such as painters and plasterers who may have limited knowledge of scaffolds. Further information can be found on the High risk work licensing page. Scaffolding of more than 4 metres in height must be erected, altered and dismantled by a competent and appropriately licensed person as defined under the Act.Ī high risk work licence is required for scaffolding work. Platforms should be at least five planks wide. Heavy duty - up to 675 kg per bay, required for bricklaying, concreting, demolition work and other tasks involving heavy loads or impact forces. Platforms should be at least four planks wide. Medium duty - up to 450 kg per bay, suitable for general trades work. Platforms should be at least two planks wide. Light duty - up to 225 kg per bay, suitable for work undertaken by a maximum of two people with a maximum of 65 kg of tools and materials for example painting, electrical work and carpentry tasks. Scaffold working platforms are generally rated as light, medium or heavy duty depending on the weight they can safely support. principal contractors for a 'construction project' where the cost of construction work is $250,000 or more.scaffolding contractors and workers who carry out scaffolding work.Safety Recall Information - For important safety recall information, click here.įor any difficulty using this site with a screen reader or because of a disability, please contact us at 1-80 or For California consumers: For more information about our privacy practices, click here.Under the Work Health and Safety Act 2011 a range of people have specific responsibilities for scaffolds and scaffolding including: For more information, go to or see a Harbor Freight store associate. No other meaning of "Compare to" should be implied. Prices advertised by others may vary by location. To receive the coupon prices online, the coupon code(s) must be entered into your shopping cart.Īt Harbor Freight Tools, the "Compare to" price means that the specified comparison, which is an item with the same or similar function, was advertised for sale at or above the "Compare to" price by another additional retailer in the U.S. PRICES - Although we make every effort to assure that our prices, products and coupons are advertised as accurately as possible, we are only human, and in the event an error is made, we reserve the right to correct it. No use on prior purchases after 30 days from original purchase or without original receipt.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |